Document the existing service
Record service and panel ratings, spaces, grounding, bonding, major loads, meter location and prior alterations. Separate safety correction from capacity needed for the solar design.
A sound Garden Home solar scope starts with the meter, service, loads, roof and project goal—not a generic panel count. Washington County publishes renewable electrical permit resources, Oregon explains licensed electrical work, and the serving utility controls interconnection. Confirm the address and utility before accepting a design.
Require existing-service and load evidence, roof and shade findings, one-line design, complete equipment and pathways, permit and utility responsibilities, outage planning, commissioning and closeout records.
Record service and panel ratings, spaces, grounding, bonding, major loads, meter location and prior alterations. Separate safety correction from capacity needed for the solar design.
Use available consumption records and planned loads to state the design basis. Distinguish bill offset, electrification readiness and resilience because batteries and backup loads are separate decisions.
Identify roofing material, age or condition evidence, drainage, penetrations, attachments and future reroof responsibility. Assign structural review and weatherproofing.
Garden Home includes unincorporated Washington County properties, and the county publishes renewable electrical application materials. Verify the parcel and exact scope.
Interconnection is separate from building approval. Confirm the account and current utility process, application duties, meter work and permission-to-operate responsibility.
Search the construction business through Oregon CCB and verify electrical work through applicable Oregon records. Name who designs, permits, installs and commissions.
State expected outages and essential-load needs. Test protective functions, labels, grounding, shutdown, monitoring and operation against the approved design.
Retain approved plans, permits, inspection records, utility permission, serial numbers, photos, warranties, monitoring access and emergency shutdown instructions.
Describe your project once and we help connect your request with relevant local contractors who serve your area. The request is free, there is no obligation to hire, and you decide whether anyone is right for the job.
Washington County provides residential renewable electrical application resources.
Confirm the Garden Home parcel before assigning county or city review responsibilities.
Oregon BCD explains that electrical work is performed under the applicable license.
| Layer | Question | Required evidence |
|---|---|---|
| Property | Is the roof or site suitable? | Condition, shade and attachment plan |
| Electrical | Can the service accept the system? | Ratings, load basis and one-line |
| County | Which permits and inspections apply? | Property authority and approved record |
| Utility | What interconnection steps apply? | Serving utility and permission |
| Equipment | What is being installed? | Model schedule and warranties |
| Operation | How is function verified? | Commissioning and monitoring access |
Separate assessment, design, permits, utility application, service work, modules, inverter, attachments, pathways, monitoring, shutdowns and closeout. Treat savings as disclosed assumptions rather than universal promises.
No. The decision depends on documented service condition, ratings, loads and the proposed connection method.
Confirm the property. Washington County may serve unincorporated Garden Home addresses and publishes renewable electrical application resources.
No. Permit and interconnection are separate reviews with separate completion evidence.
Search the legal construction business through Oregon CCB and verify the electrical license through applicable state records.
Yes. Record condition, expected remaining work, attachment design and responsibility for future removal and reinstallation.
Treat production and savings projections as assumptions unless the contract defines the basis and remedy.
Verify approved equipment, grounding, labels, protective functions, shutdown, monitoring and operating instructions.
Keep approved plans, permits, inspections, utility permission, equipment records, warranties, photos and monitoring access.
Share service, roof, usage and project-goal information for proposals based on the complete system.