Can my old deck be saved?expand_more
Often the framing is fine and only the surface and railings are shot. A builder should probe the ledger, posts, and joist tops with an awl and tell you honestly. If the ledger was never properly flashed — common on older builds — that gets corrected regardless of which route you take.
What time of year should a deck be built?expand_more
Framing happens year-round, but staining or sealing wood needs dry weather, so late spring through early fall is the practical window for a finished result. Booking in winter for a spring build usually gets you a better spot in the schedule.
Do I need to tell my neighbor about a new fence?expand_more
Legally you can build on your own property without permission, but the practical answer is always talk first. Agreeing on the line, and on who pays for what if you share it, avoids the disputes that make fences memorable for the wrong reasons.
How long does a typical deck take to build?expand_more
Most Beaverton residential decks take one to two weeks of crew time once permits are in hand. Elevated decks with stairs and complex railings run longer. Permit review adds a couple of weeks before that.
Is composite decking slippery here?expand_more
Any decking gets slick when algae grows on it, composite included. The difference is that composite cleans up with a wash and doesn't need re-sealing. Choosing a textured surface and keeping the deck clear of leaf litter matters more than the material.